The safest schedule gives time for decisions as well as production. Delays often come from late approvals, missing brand files, product dimensions or last-minute changes rather than from fabrication itself.
What matters most
- Start with a confirmed floor plan and a written brief before concept design.
- Freeze the main architecture before final print artwork and production drawings are released.
- Plan a clear approval deadline for graphics, furniture, screens and electrical requirements.
- Keep a final buffer for transport, venue access, installation adjustments and cleaning.
Practical planning
For a deadline-driven exhibition, work backwards from venue handover and assign a decision date to every major approval.
Common mistakes to avoid
- Starting design before the stand dimensions are final.
- Changing the main structure after materials are already in production.
- Assuming every supplier can work safely with an emergency schedule.
What to do next